University of Cape Coast Institutional Repository

Upstream Fiscal Regime Redesign for Value Optimisation: A Case Study of the Jubilee Field in Ghana

Show simple item record

dc.contributor.author Ashitey, Ashikwei Desmond
dc.date.accessioned 2024-09-05T07:57:23Z
dc.date.available 2024-09-05T07:57:23Z
dc.date.issued 2022-12
dc.identifier.uri http://hdl.handle.net/123456789/11109
dc.description i, xiv; 126p en_US
dc.description.abstract Globally petroleum fiscal regime defines the extent to which the host government and the prospective investor can apportion risks and share project rewards. Ghana’s petroleum industry has become an attractive place for many foreign investors. The current upstream fiscal regime that governs the development of petroleum resources in Ghana does not capture windfall profit and further does not enable value creation for development. The challenges for the loopholes in the existing fiscal regime of Ghana are the fixed regressive royalty and the non-profitable additional entitlement elements constituting fiscal regime. To ascertain the performance of the current upstream petroleum fiscal regime, it was compared to some Gulf of Guinea countries fiscal regime and was ranked. A proposed upstream fiscal regime to create value for the petroleum industry of Ghana was modelled using the discounted cash-flow framework. The new regime has a sliding scale royalty tied to the R-Factor of the project. The regime’s value was then measured using petroleum economic profitability indicators. These indicators are Net present value (NPV), Internal rate of return (IRR), Present value ratio (PVR) and Profitability index (PI). The current fiscal regime of Ghana had an NPV of the government take (GT) to be $2.86 billion whilst that of the proposed regime had $ 3.02 billion when it was discounted. For the undiscounted, the current fiscal regime had GT NPV of $ 6.92 billion and the proposed made $ 7.29 billion. The proposed fiscal regime created a value of $ 160 million when the cash flow was discounted and $370 million when it was not discounted for the Government. The models successfully incorporated Monte-Carlo simulation using @RISK software to account for risk and uncertainty in decision making en_US
dc.language.iso en en_US
dc.publisher University of Cape Coast en_US
dc.subject Additional oil entitlement, Corporate income tax, Deterministic analysis, Economics of exhaustible resources, Foreign direct investment, Pareto Optimality, Petroleum economic model, Petroleum upstream fiscal regime, Production sharing contract, Profitability indicators, Resource curse theory, R-Factor, Royalties, Royalty and tax regime, Sliding scale royalty, Stochastic analys en_US
dc.title Upstream Fiscal Regime Redesign for Value Optimisation: A Case Study of the Jubilee Field in Ghana en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search UCC IR


Advanced Search

Browse

My Account